Niko Scaffolding Runway System
Niko Scaffolding Runway System
Niko Scaffolding Runway System
* Images are for Illustration Purposes only.
POA - Please call for details
Features
- Clamps to existing scaffolding structure
- Lift and move loads up to 2000kg
- Cantilever over the end of the scaffolding
- Available in straight and curved sections
- Change direction with junction switches
- Suspend a bridge from 2 runways to create a crane system
- Supplied in kit form for ease of installation, extension and relocation
- Some components approved to EN795 for fall arrest
Product Range
-
Niko Profile
SWL
Track support centres
Max. Cantilever
24.000
125kg
1m
0.35m
25.000
250kg
1.5m
0.4m
26.000
500kg
1.5m
0.5m
27.000
1000kg
1.5m
0.5m
27.000 *
1600kg
1m
0.3m
* Requires double load trolley